Fort Bedford Trout Unlimited Potter Creek CAP Project
FBTU Potter Creek Project - 2024
View downstream of lower end of project site illustrating steepness and height of eroded stream bank
FBTU Potter Creek Project - 2024
View upstream of upper end of project site illustrating steepness and height of eroded stream bank - beginning bank preparation for cross-log grade control
FBTU Potter Creek Project - 2024
Cross-log grade control installed at upper end of project
FBTU Potter Creek Project - 2024
Two sections of modified mud-sill installed downstream from grade control
FBTU Potter Creek Project - 2024
Excavator removing material for a sill-log trench
FBTU Potter Creek Project - 2024
Second cross-log grade control, excavator shaping bank to install face logs on mud-sill sectiom
FBTU Potter Creek Project - 2024
Crew pinning sill logs in trench
FBTU Potter Creek Project - 2024
Excavator placing riprap in sill log trench
FBTU Potter Creek Project - 2024
Excavator positioning to dig trenches for log-framed rock deflector
FBTU Potter Creek Project - 2024
Excavator shaping bank on lower reach prior to seeding and placing erosion-control matting
FBTU Potter Creek Project - 2024
Completed project from upstream end looking downstream showing shaped bank and two grade controls
FBTU Potter Creek Project - 2024
View from lower end of project looking upstream showing rock-riffle grade control, reshaped bank, and log-framed rock deflector on opposite bank