View downstream of lower end of project site illustrating steepness and height of eroded stream bank
View upstream of upper end of project site illustrating steepness and height of eroded stream bank - beginning bank preparation for cross-log grade control
Cross-log grade control installed at upper end of project
Two sections of modified mud-sill installed downstream from grade control
Excavator removing material for a sill-log trench
Second cross-log grade control, excavator shaping bank to install face logs on mud-sill sectiom
Crew pinning sill logs in trench
Excavator placing riprap in sill log trench
Excavator positioning to dig trenches for log-framed rock deflector
Excavator shaping bank on lower reach prior to seeding and placing erosion-control matting
Completed project from upstream end looking downstream showing shaped bank and two grade controls
View from lower end of project looking upstream showing rock-riffle grade control, reshaped bank, and log-framed rock deflector on opposite bank